The pervious concrete floor is environmentally friendly, practical and beautiful, but it is not easy to construct, especially the preparation and maintenance during the construction process are very important, which is related to the quality and cost of the floor after construction.
Preparation before construction of permeable concrete floor:
The pervious concrete uses natural colored stone as aggregate, is mixed with cement, cement, surface sealant and water, and is laid through a specific mixing process.
The material is prepared to use crushed stone of a certain particle size instead of aggregate, and there is a certain amount of binder and crushed stone in the construction. And prepare a series of material preparations such as water, electricity, adhesive tarpaulin, and setting site for mixing machinery.
Construction steps of permeable concrete floor:
1. Clean
Before the construction of the permeable concrete surface layer, the concrete structure layer should be cleaned. The surface of the treated concrete structure layer should be rough, clean, free of water, and kept in a certain wet state.
2. Stir
Put the prepared materials into the mixer in the order of feeding, and stir evenly. Put the admixture, cement and crushed stone into the mixer, and after stirring for 30 seconds, add the weighed water to the mixer for 2-3 times for mixing, and the mixing time should be controlled within 2 minutes.
3. Transportation
The initial setting time of pervious concrete is short. After the mixture is discharged from the mixer, it is transported to the paving site for paving, vibrating and surface treatment. Determined according to the construction temperature, generally controlled within 1 hour.
4. Paving
Plain pervious concrete should be spread
and compacted by using a concrete paver or plate vibrator. Refill the uneven
places, vibrate again to make it smooth, and vibrate the corners to make it
denser.
5. Surface pouring
The strong permeable concrete of the
surface layer should be poured at the same time as the pervious concrete of the
lower layer, and the paving time interval between the two layers should not be
too long. The lower layer of pervious concrete is covered with water at
intervals.
Use a special road roller for surface
permeable concrete to vibrate and compact, the large pores are manually
leveled, and the edges and corners are vibrated and compacted.
6. Surface sealant
According to the dryness of the weather,
after curing the permeable concrete surface layer for 2-5 days, spray two
layers of transparent surface sealant.
7. Within 7 days after the completion of
construction, the finished floor should be cut and treated. After the seam is
finished, spray the color brightener after the floor is completely dry.
DTS Diamond Tools is a professional manufacturer of diamond tooling for concrete grinding and concrete polishing. We provide a wide range of diamond tooling on the market such as HTC tooling, Husqvarna tooling, Scanmaskin tooling, STI Prep/Master tooling, Klindex toooling, XPS tooling, Terrco tooling, Blastrac tooling, Diamatic tooling, Stonkor tooling with lowest cost and most reliable quality. If you are looking for a solution to your concrete floor, we can provide you with professional advice and guidance, welcome to click the picture to get into our web.